SkyPier Ferry Terminal

Hong Kong International Airport

OTC staff* led the planning and design of the permanent ferry terminal linking HKIA to ports in Macau and the Pearl River Delta. The unique concept provides for direct, bonded transfer between Mainland China and Macau passengers and flights at HKIA, providing “HKIA experience” all the way to the ferry door. The design included a spacious departures lounge overlooking the ferry berths; passenger boarding via enclosed, air-conditioned corridors on pontoons; airline check-in facilities; security screening; innovative baggage handling facilities; an extension of the Terminal 2 Automated People Mover (APM) line, with a direct link to departures gates via East Hall in Terminal 1 and SkyPier origin/destination processing facilities located in Terminal 2 via a 3-platform APM station.

SkyPier was designed to be implemented in 3 phases for an ultimate capacity of 8 berths or 10M pax/year. Safeguards were put in place for a future expansion tower for the new hotel built on an abutting property.

*Working for Skidmore, Owings & Merill LLP (SOM)

Airport:Hong Kong International Airport (HKG)
Location:Hong Kong SAR
Year:2005-2006
Completion:2009
Services:
Modes:
Client:Airport Authority Hong Kong
Collaborators:Aedas, Mott MacDonald, Arup
Photo of the exterior of the HKIA SkyPier Ferry Terminal

Similar Projects

Previous
Previous

Arrivals Area Master Plan and GTC

Next
Next

NJT Terminal and Yard Master Plan